Roadworks – High Street, Battle

Good Morning,

I am writing to advise that we will be carrying out drainage works on High Street Battle.

Work will start on Monday 27 February and continue for two nights.

The road will remain open with temporary traffic lights in place between 8pm and 4am.

There will also be parking restrictions in place. There will be ‘no parking’ signs and cones on site to advise where parking is restricted.

Please also see our website for information about this work: https://www.eastsussexhighways.com/highway-schemes/high-street-battle-drainage

Please get back to me if you have any questions about this.

Kind Regards

Zoe West

Customer Contact Centre | East Sussex Highways

Tel: 0345 60 80 193 | Email: customer@eastsussexhighways.com | Website: www.eastsussexhighways.com

Logo, company name

Description automatically generated

 

Roadworks – A21 Whatlington

Notification from National Highways – completion of improvement works to A21 at Whatlington at the B2089 and B2090 junctions.
The A21 will be closed on weeknights (8pm to 6am) between John’s Cross roundabout and the junction with Whatlington Road from Monday 16.01.23 until Wednesday 25.01.23.
A diversion route will be in place in both directions via the A2100.  A map of this route on our A21 safety package website is available on the link below.  https://nationalhighways.co.uk/our-roads/south-east/a21-safety-package/
Times and dates of this work are subject to change if there is adverse weather or any other unforeseen circumstances.
We are contacting properties with access directly off the A21 within the closure, to advise them of the support we are providing so that they can continue to access their homes or businesses safely during the closure.  Access will be maintained for emergency vehicles on blue light calls.
You can contact National Highways Customer Contact Centre on 0300 123 5000 (24/7) who will direct your enquiry to the most appropriate person, or you can email on – info@nationalhighways.co.uk

 

Road closure Hoath Hill 25.08.22

Just had notification from ESCC Highways that a carriageway patch repair will take place on Hoath Hill.  This repair will be approximately 46.2 metres.
The works will take place on Thursday 25th August.
Hoath Hill will be closed to through traffic between 0800 and 1600 from New Cut to Solomon’s Lane.
Traffic will be diverted via New Cut, London Road (A2100) and Solomon’s Lane.

Road closure A2100 13-16th May

The A2100 will be closed on 13.05.22-16.05.22 to allow Network Rail to carry out railway maintenance works – 30 metres at either side of the level crossing.
The diversion will be via – A21(T) Vinehall Road/Woodmans Green Road/Hastings Road/New Road/Whydown Hill/Kent Street/Ebdens Hill/Sedlescombe Road North-A2100 Junction Road/The Ridge West/Battle Road/Hastings Road/Battle Hill/Lower Lake/High Street and vice versa.
Advance warning signs will be placed on site advising of actual date of works.
If you need to discuss this further, please contact Network Rail on 0345 711 4141.

Map A2100 road closure 13-16 May

ESCC Highways – Fortnightly Lookahead w/c 29.11.21

Message from ESCC Highways

Please find details of our planned maintenance works for the next 14 days, which include works in your area on the following link: https://www.eastsussexhighways.com/highway-schemes/fortnightly-lookahead This is updated on a weekly basis, and we will continue to send more detailed information of higher impact works.

If you would like further details on any of the listed works, please do not hesitate to contact me.

Please get back to me if you have any questions about this.

Kind regards

Corinne Black | Customer Service Manager Customer Contact Centre | East Sussex Highways Tel: 0345 60 80 193 | Website: www.eastsussexhighways.com

A21 roadworks – Blackbrooks Parapet

Works will be carried out by A-One-+ on behalf of Highways England on the A21 carriageway between Riccards Lane and Marley Lane, to establish ground conditions for a proposed carriageway resurfacing scheme.
To carry out these works as efficiently and safely as possible, works will be carried out under full closures of the A21 between Riccards Lane and Marley Lane between the hours of 8pm to 6am from 01.09.20 to 11.09.20 (Monday to Friday only).
Clearly signed diversions will be in place during all closures, utilising local routes and suitable for all types of vehicles, when full closures of the carriageway are in place.

South Diversion Route

A21 heading south – traffic wishing to travel along the A21 will be diverted at John’s Cross roundabout to follow the A2100 through to Baldslow, where traffic can re-join the A21.

North Diversion Route

A21 traffic wishing to travel north will be directed from Baldslow to follow the A2100, to re-join the A21 at John’s Cross roundabout.

Residents living within the closure between Riccards Lane and Marley Lane – please wait at the hard closure points and you will be escorted to your property.  Residents wishing to leave their property whilst the closure is in place – please call our NCC on 0845 6122 888 who will contact site to send an escort to your property.  Please be advised that there may be a short wait for the escort vehicle.

Contact Us

If you have any questions or if you’d like to know about the work taking place, please do not hesitate to contact Highways England as follows

Phone – 01732 446800
Post – 10 Kings Hill Avenue, Kings Hill, Kent ME19 4AR
Email – area4enquiries@aone.uk.com or info@highwaysengland.co.uk
Website – www.highwaysengland.co.uk

 

A21 roadworks – resurfacing

There will be resurfacing roadworks on the A21

  • In both directions from Coopers Corner roundabout to the John’s Cross roundabout on 10.08.20 from 20.00-06.00.
  • In both directions from Northbridge Street roundabout to John’s Cross roundabout 11.08.20 and 12.08.20 from 20.00-06.00.

Emergency vehicles will always be provided with access through the works.  Local traffic can access the A21 up to the individual closure points and residents with access only off the A21 will be escorted through the works.

Diversions

  • Southbound – southbound traffic on the A21 will be diverted off the A21 at the Flimwell crossroads on the the eastbound A268, before joining the A28.  Traffic will then continue on the A28 to re-join the A21 at Baldslow.
  • Northbound – northbound traffic will leave the A21 at Baldslow and join the A28, before joining the westbound A268.  Traffic will then continue on the A268 to re-join the A21 at Flimwell.