Work at Riverhall Level Crossing 08.12.23

Network Rail and OpenReach will be working at the Riverhall Level Crossing on 08.12.23, between 0125 and 0515.

This is to extend the fibre cable across the railway line to benefit the residents in Eatenden Lane. OpenReach say any noise will be minimal.